Maintenance & EAM
Machine-to-spare linkage and work order trackingAhmed Al-Rashidi
๐
๐ญ
4
Total Machines
โ
2
Operational
โ ๏ธ
2
Warning
๐ด
0
Down
๐ง Machine Fleet
Linked spares and maintenance status
Port Crane C-01
Overhead Crane ยท Dock A โ Bay 3
Warning
Last Maintenance
2026-03-12
Next Maintenance
2026-04-25
Linked Spare Parts
๐ด Crane Hydraulic Pump (3 Units)โ
Hydraulic Oil ISO 46 (45 Liters)โ
Steel Wire Rope 20mm (200 Meters)
Forklift FL-12
Heavy Forklift ยท Warehouse Bay 7
Warning
Last Maintenance
2026-03-01
Next Maintenance
2026-04-20
Linked Spare Parts
๐ด Forklift Tire (Heavy Duty) (7 Units)โ
Hydraulic Oil ISO 46 (45 Liters)
Conveyor System B
Belt Conveyor ยท Processing Line 2
Operational
Last Maintenance
2026-04-02
Next Maintenance
2026-05-15
Linked Spare Parts
โ ๏ธ Conveyor Belt Segment (12 Meters)โ ๏ธ Drive Chain 12B-2 (9 Meters)
Harbor Crane HC-02
Gantry Crane ยท Dock B โ Bay 1
Operational
Last Maintenance
2026-04-08
Next Maintenance
2026-05-28
Linked Spare Parts
โ
Safety Pressure Valve (18 Units)โ
Steel Wire Rope 20mm (200 Meters)
๐
Upcoming Maintenance Schedule
| Machine | Type | Location | Last Service | Next Service | Spares Ready | Status | Action |
|---|---|---|---|---|---|---|---|
| Port Crane C-01 | Overhead Crane | Dock A โ Bay 3 | 2026-03-12 | 2026-04-25 | โ ๏ธ Review | Warning | |
| Forklift FL-12 | Heavy Forklift | Warehouse Bay 7 | 2026-03-01 | 2026-04-20 | โ ๏ธ Review | Warning | |
| Conveyor System B | Belt Conveyor | Processing Line 2 | 2026-04-02 | 2026-05-15 | โ ๏ธ Review | Operational | |
| Harbor Crane HC-02 | Gantry Crane | Dock B โ Bay 1 | 2026-04-08 | 2026-05-28 | โ Ready | Operational |